Skip to product information
1 of 4

OASE

OASE AquaMax Eco Expert 44000

OASE AquaMax Eco Expert 44000

Regular price $5,400.00 AUD
Regular price Sale price $5,400.00 AUD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity

 

The Oase AquaMax Eco Expert 44000 is an energy-efficient pump delivering an extremely powerful and economic capacity. Perfect for use in demanding filter systems or for large watercourses and waterfalls.

The robust and durable stainless-steel housing contains an exceptionally quiet running pump, which can be installed dry or submerged.

Oase AquaMax Eco Expert's includes variable speed control via the OASE InScenio EGC Controller Cloud and Oase Control Cables (sold separately) with the Oase Control App so you can control and monitor your pump from your smart phone.

The AquaMax Eco Expert 4400 includes the optional Seasonal Flow Control. When switched on, the pump automatically optimises and reduces flow rates in colder conditions, saving energy and lowering running costs by up to 30%.

AquaMax Eco Expert 44000 Specifications

  • Wet & Dry installation
  • Maximum flow -  44 m³ per hour
  • Power Consumption 140w - 700w
  • Maximum head 9.5 m
  • Dimensions (LxWxH) 540mm x 250mm x 200mm
  • Dry run protection
  • Coarse debris of particles up to 11 mm in size
  • Robust and durable stainless steel housing for stability
  • Unique, patented frost protection: the pump will not be damaged at temperatures down to as low as -20° C
  • Protection against dry run and blocking through Environmental Function Control (EFC by OASE)
  • The pump is unusually quiet in operation; ideal for use in a pump chamber
  • MADE IN GERMANY: precise and reliable German engineering skills at a particularly high quality level
View full details